Key takeaways
- Queensville and Sharon share one supply from four York wells in Queensville blended with lake water, hard at 160 to 175 mg/L and slightly high in sodium.
- The town grew from 23,991 to 34,637 people between 2016 and 2021, and the Green Lane plan adds new streets by the GO station.
- Sharon's homes run from the heritage core to suburbs of the 1950s through 1990s, so the pipes depend on the decade a house went up.
- New homes connect under the Town's engineering notes, with the meter supplied by the Town and any leak past the curb stop the owner's.
Four Queensville wells behind every Sharon tap
Queensville and Sharon draw on one source. York Region pumps four wells inside Queensville, holds the water in a single storage facility and blends it with Lake Ontario water that arrives by Leslie Street and Woodbine Avenue. York counts close to 11,000 people on this supply. Chlorine treats it first, chloramine stays with it in the pipes, and sodium silicate keeps iron and manganese in solution so they do not stain your fixtures.
York's table rates Queensville at 160 mg/L. The Town gives a single number, 175 ppm, for the whole system it runs with Holland Landing, and that is the figure to use for a Sharon softener. Sodium averaged 21.4 mg/L in 2025, slightly over the level York reports to health officials. Design of a new treatment plant for this supply shows up in York's spending for 2025. Until that plant exists, set any filter or softener for the water you have today.
A town that grew by almost half in five years
The 2021 census counted 34,637 residents, against 23,991 five years earlier, a rise of 44.4 per cent. About three in ten occupied homes in town went up between 2016 and 2021. The Green Lane Secondary Plan, adopted in 2018, sets out about 630 hectares between the south boundary and Leslie Street around the East Gwillimbury GO station, planned for some 28,750 residents and 4,340 jobs once it is complete.
Queensville is changing as well. The Health and Active Living Plaza opened its library branch in October 2025, and in April 2026 the Province chose the village for Southlake Health's planned hospital. For plumbing, growth brings two kinds of call side by side. New owners ask for basement finishes, softener loops and first-winter checks. Owners of older houses close by ask about sewer laterals, tired shut-off valves and heaters full of scale.
Postwar suburbs beside the heritage core
Sharon packs several eras of building into a short stretch of Leslie Street. The old village, called Hope until 1841, grew around the Sharon Temple that the Children of Peace finished in 1831. Its houses are the oldest on the corridor and fall inside the heritage conservation district whose plan the Town adopted in May 2026. Suburban streets began in the mid-1950s, a second wave spread east of the village in the 1970s, and by the 1990s new homes ringed the core.
Each wave left different pipes. General Ontario practice puts galvanized supply and cast-iron drains in houses from before the 1960s, copper and ABS after, grey Poly-B in homes plumbed between 1978 and 1995, and Kitec in many finished over the twelve years after that. A house from the 1970s may still carry copper joints made with lead solder, used until 1990. In the heritage core the extra question is what shows outside, a new vent or a moved hose bib, so check with the Town before work that alters the street face.
Pumping stations that carry the centre south
Neither Queensville nor Sharon has a sewage plant of its own. Both feed the regional network. Town-owned local sewers, 150 to 375 mm across, gather flow in the central area, and York's pumping stations take it from there. The 2nd Concession and Queensville West stations push it south through the York Durham Sewage System toward the lakeside treatment plant at Duffin Creek, and the Leslie Street area drains across the town line to the south.
Growth is pressing on that network. A new Queensville East station and its forcemains are on York's list for 2031, Queensville West gets its upgrade in 2036, and the Province confirmed the York Region Sewage Works Project in April 2024. None of that reaches inside your lot. Clearing a blocked lateral on your own land is up to you. When the cause may be on the Town side, the Town asks for a signed Sewer Servicing Agreement and a free Ontario One Call locate before its contractor comes out.
Connecting a new house to the mains
New construction in the Green Lane corridor follows the Town's engineering notes. The top of a watermain lies at least 1.7 m under the road, and a house service is 19 mm Type K copper buried under no less than 1.6 m of earth. That depth keeps the street line well below the frost, so a first winter freeze usually starts inside, at a hose bib or a garage line.
The service connection from the main to the property line is the Town's. The Town supplies and inspects the water meter, and a licensed plumber installs it. Past the curb stop, any leak belongs to the owner. If your new house has a sump pit, by-law 2018-083 keeps its discharge on your lot and away from the foundation. A basement bathroom, a second laundry or an outdoor kitchen may need a permit, so we check that before the drywall goes up and plan the drain runs while the walls are still open.
Neighbourhoods in this area
Services for this area
Water Softeners
Need Water Softeners in East Gwillimbury? Plumbing East Gwillimbury handles the work cleanly and verifies everything is working right. Book today.
Plumbing For New Construction
Need Plumbing For New Construction in East Gwillimbury? Plumbing East Gwillimbury installs new plumbing systems with tested results. Request an appointment.
New Water Mains Connection Services
Need New Water Mains Connection Services in East Gwillimbury? Plumbing East Gwillimbury installs new services and verifies pressure and flow. Request an appointment.
Repiping
Need Repiping in East Gwillimbury? Plumbing East Gwillimbury upgrades old piping and confirms everything holds under pressure. Schedule a quote.
Lead Pipe Replacement
Need Lead Pipe Replacement in East Gwillimbury? Plumbing East Gwillimbury replaces lead lines and verifies pressure and water flow. Schedule a quote.
Drains Camera Inspection
Need Drains Camera Inspection in East Gwillimbury? Plumbing East Gwillimbury inspects lines and provides a clear report. Book an assessment.
FAQ